December 6, 2022 — Special Meeting

Conroe Independent School District Board of Trustees — Special Meeting

View interactive version →

Conroe ISD Board Meeting — 2022-12-06

Special Meeting — Unofficial Notes

Based on auto-generated transcript. Not an official record.

Generated 2026-03-28 14:57 UTC


Unofficial Meeting Notes — Conroe ISD Board of Trustees

Date: December 6, 2022

Meeting Type: Special Meeting (Board Reorganization) followed by Board Workshop

Notes: These are unofficial notes based on an auto-generated transcript. They may contain errors or omissions.


SPECIAL MEETING — Board Reorganization (Called to order at 4:04 PM)

Invocation & Pledges

Citizen Participation

Executive Session

Board Reorganization — Officer Elections

| Position | Elected | Vote |

|---|---|---|

| President | Skeeter Hubert | 4–3 |

| First Vice President | Theresa Wagaman | 4–3 (over Missy Odenweller) |

| Second Vice President | Stacy Chase | 7–0 (unanimous) |

| Secretary | Datron Williams | 4–3 (over Melissa Duncan) |

| Assistant Secretary | Tiffany Nelson | 4–3 (over Melissa Duncan) |

Special Meeting adjourned.


BOARD WORKSHOP (Began at approximately 5:36 PM)

Public Comment

Workshop Overview

Three agenda items:

1. PASA Demographic Study Overview

2. TEA Facility Standards and Educational Specifications Review

3. Preliminary Bond Committee Process Discussion


Item 1: PASA Demographic Study Overview

Presenters: Dr. Stacy Tepera (President/Owner, Population and Survey Analysts — PASA), Angela Fretz, Tiffany Thomas Rogers. Introduced by Mr. McCord.

District Context

Methodology & Key Data Points

Housing Projections (10-Year)

Total projected new housing occupancies: ~53,305

Key developments driving growth: Artavia, Woodson's Reserve (expansions), Mavera, Evergreen, Silverthorne, Sweetwater Ridge, Grand Central Park, Pine Acre Trails, Timber Point, Spring Branch Crossing

Manufactured housing is a significant new factor — concentrated in far east district; both acreage-type and amenitized communities; can build out quickly with relatively high student ratios.

Economic context: Interest rates have risen significantly (30-year fixed at ~6.5%), making homes less affordable for some first-time buyers. Housing market showing signs of cooling (slowed sales, rising inventory, price depreciation). However, long-term demand for residential development in Conroe ISD remains strong due to location and infrastructure.

Enrollment Projections

| Scenario | 10-Year Projection (by ~2032) |

|---|---|

| Low Growth | Not specified precisely but lower bound |

| Moderate Growth | ~98,000 students (from current ~70,000+) |

| High Growth | Potentially ~120,000+ students |

Campus-Level Impacts (Moderate Scenario)

Elementary level — Areas of greatest projected growth:

Color-coded capacity analysis provided year-by-year:

Intermediate level:

Junior High level:

High School level — Major concerns:

Projected New Facility Needs (Moderate Growth, 10-Year, by Feeder)

| Feeder | Projected New Facilities |

|---|---|

| Caney Creek | 5 elementary schools, Veterans Memorial + 1 more intermediate, new Moorhead + 1 more junior high, 1 high school equivalent |

| Conroe | Bartlett Elementary (under construction) + 2 more elementaries + 1 K-6, 1 intermediate, 1 junior high, 1 high school |

| Woodlands | 1 K-6 |

| Oak Ridge | 1 K-6 (to relieve Suchma) |

| Grand Oaks | Heinz Elementary + 1 more elementary, 1 junior high, 1 ninth grade center |

Dr. Noel estimated the total cost of projected new buildings alone at well over $2 billion, not including work needed on the district's 67 existing buildings.

Significant Board Discussion During Demographic Presentation


Item 2: TEA Facility Standards & Educational Specifications Review

Presenters: Easy Foster (Director of Planning & Construction, CISD), Jennifer Hendrickson and Jen Camper Peeler (Principals, Stantec), with Steve Parker and Denise Rivas

New TEA Facility Standards (Effective November 2021)

The Texas Education Agency updated facility standards for the first time since 2004. Key new mandatory requirements for boards:

1. Adopt a long-range facility master plan (update every 5 years)

2. Approve educational specifications (update every 5 years)

3. Approve method of compliance (quantitative vs. qualitative — how instructional capacity is calculated)

4. Approve level of flexibility (L1–L4)

5. Implement safety and security features in capital projects over $1M

6. Use third-party code enforcement inspectors (new cost)

7. Create certificates of compliance for audit purposes

Trigger threshold: Any project over $50,000 must comply.

Key Changes in Square Footage Requirements

Recommendations for Board Adoption

Staff recommended the board adopt:

1. Quantitative method of compliance (used by 99% of districts)

2. L2 flexibility level (standard instruction delivery with some collaborative flexibility)

3. Educational specifications for four facility types

Educational Specifications Development Process

- Elementary: Baseline 1,000 students

- Intermediate: Baseline 1,000 students

- Junior High: Baseline 1,600 students

- High School: Baseline 3,400 students

Dr. Noel clarified that adopting the Ed Specs is not a commitment to build anything specific — it is a roadmap/reference document for future planning.

Board Discussion


Item 3: Preliminary Bond Committee Process Discussion

Presenter: Dr. Curtis Null, Superintendent

Proposed Timeline

Key Changes from Previous Bond Process

Financial Context

Significant Board Discussion

Board Committee Assignments


Key Outcomes & Action Items

| Item | Outcome |

|---|---|

| Board officer elections | All positions filled (see table above) |

| PASA Demographic Study | Received/discussed; will be posted publicly on district website |

| Ed Specs adoption | Deferred from December to January board meeting to allow review time |

| Bond committee website | Board gave general approval to turn forward-facing and begin collecting names before Christmas break |

| Bond committee process | General consensus on approach; financial models to be presented at future workshop |

| Board training | This workshop session counted as board training hours |

Workshop adjourned at approximately 9:41 PM.